EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Duckie
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (188)
Research
Workshop
- (2)
Empennage
- (2)
Fuselage
- (18)
-
Installed canopy...
-
Designed canopy...
-
Installed Canopy Hinge
-
Applied 2 extra...
-
Cut bottom open for...
-
Investigated warped...
-
Repaired all aileron...
-
Created arm rest...
-
Assembled rudder pedals
-
Primed interior
-
Cleaned, sanded...
-
Test fitted engine...
-
Trimmed firewall more
-
Made baggage hole...
-
Microed canopy seam
-
Installed baggage...
-
Remounted tail section
-
Fiberglass Day
Firewall
- (7)
Tail Feathers
Wings
- (2)
Controls
- (27)
Avionics
- (21)
Lighting
- (2)
Instrument Panel
- (11)
Landing Gear
- (12)
Engine
- (40)
Propeller
- (6)
Fuel System
- (11)
Interior Finish
- (7)
Paint / Decals
- (10)
Inspection
- (10)
Tools
Builder Name:
Robert Schmid
-
Project:
Quickie - Q2
-
VIEW REPORTS
Total Hours:
1219
Start/Last Date:
Apr 29, 2022 - Aug 31, 2023
Engine:
O-200
Propeller:
Catto
Panel:
Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
Friendly URL:
https://eaabuilderslog.org?s=Duckie
Home or Last Project Picture
Apr 27, 2023
Installed canopy lock & safety mechanism
- (4 hours)
Category: Fuselage
Used stock design, made CAD drawings and had it cut at Xometry.com
IMG_1246.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.